View Single Post
Old 03-10-2006, 10:51 PM   #4 (permalink)
Nitrohuffer
Victim

 
Nitrohuffer's Avatar
 
Join Date: Jan 2006
Location: Bloomingburg, NY
Age: 31
Posts: 889
Nitrohuffer is offline
Default Re: Gohbee Stinger 90 build thread

To get the tail done you need to get the belt around the tail drive shaft. This is done by pulling the tail boom mount out of the frame, and splitting in half.
Attached Images
File Type: jpg Stinger9011 (Medium).JPG (69.5 KB, 11 views)
__________________
Lungs transformed to take in water. Give up a life of earth and fire.
  Reply With Quote