Re: PAU 36% Edge 540 Build
Time to finish up the DA-85 install. I covered the deck to keep the heat out from the canister and added some bling. I made a servo tray to get the servos center on the carb. Decided to go with a choke servo on this one. I also wanted an easy way to get to the carburetor needles so after drilling a couple holes, I CA'd in some guides into the motor mount.
After final trimming the cowl, I added a piece of automotive vacuum hose to protect the cowl add ignition wire. I may change that to something else that looks better later on. So that’s how I installed my 85 so now I’ll move on to aircraft setup.
Ken
__________________

I fly at Flypau.com
Powered by Desert Aircraft!
|