View Single Post
Old 12-21-2008, 11:11 PM   #3
Sevans16
Bad-ass Super Contributer!
 
Join Date: Jan 2007
Location: Sin City
Age: 36
Posts: 515
Default Re: Aeroworks 85cc Yak 54 Rudder Linkage

Check out my thread on here in the GS Git R Done section.

I used a Greeves pipe, pull-pull setup and it is balancing at 4" back, 1/2" past the 3.5" mark called for. I also set mine up with the 1 1/4" full arm. The 1.5"(3") arm would be plenty I think??
Sevans16 is offline   Reply With Quote