![]() |
|
|
Little progress got the stabs out of the shucks, glued the leading and trailing edge on, and back into the shuck overnight with titebond 3. I decided to set the servo boxes before sheeting and then cut them out afterwards. I also used carbon tow in everything besides the deck and sheeted with west systems epoxy.
Also framed out opening for pipe tunnel. Goingn to run a DA 170 with JTec Tuned pipes |
|
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |